Ganesh Green Bharat Limited
Procurement Cycle: 15 Days to 5
Built on Odoo 18
Ganesh Green Bharat Limited
Procurement Cycle: 15 Days to 5
Built on Odoo 18
Ganesh Green Bharat: Solar Procurement Controls on Odoo 18
A ₹400–500 crore solar EPC company moved vendor negotiation, grade control and spend approval out of WhatsApp and into Odoo 18 — and cut its procurement cycle by two-thirds.
Quick Wins:
- Zero grade-mixing incidents
- Every negotiation round on record
- Spend tiers enforced by the system
Client &
Vision
Ganesh Green Bharat Limited is a solar EPC company running ₹400–500 crore of projects, buying panels, inverters, mounting structures, cables and batteries for each one.
Their goal: a procurement process they can audit, not just remember — with grade enforced from indent to PO and every vendor price on record.

The
Challenge
Vendor negotiations happened entirely over WhatsApp and email, with no record, no traceability and no grade enforcement.
The breaking point: a solar panel batch arrived on site as Grade B instead of Grade A Tier 1. The vendor said the price difference had been agreed verbally, and there was no record to check. The project was delayed 9 days.

Pain Points
Deep-Dive
- Unstructured Vendor Negotiation — Requirements went to 5 vendors on WhatsApp, replies came in different formats, and counter-offers were never documented.
- Grade Mixing in Procurement — Grade B was ordered when Grade A Tier 1 was specified, and errors were found only at the installation site.
- No Approval Audit Trail — The MD approved purchases by WhatsApp message, with no spend tiers and no record of why a vendor was chosen.
- Zero Inventory Visibility — Warehouse locations were not mapped, committed vs available stock was unknown, and panel batches could not be traced for warranty.

Solution
Delivered
Nstack built 4 custom modules on Odoo 18 covering procurement from store indent through purchase order, with grade enforcement, structured vendor negotiation and spend approval tiers.
Every product carries a grade code, and the system blocks comparing Grade A and Grade B prices. Vendors quote and counter-offer in a portal, every round is stored permanently, and the MD approves on Odoo mobile with the full context.

Key Features /Highlights
- 1
WhatsApp → Vendor RFQ Portal: Negotiations on Record
Before: Requirements and replies scattered across WhatsApp and a spreadsheet. Now: RFQs sent from Odoo; every counter-offer stored with timestamp and actor, linked to the final PO.
- 2
WhatsApp to MD → Mobile Approval: Context on Every PO
Before: Approval by WhatsApp message, with no spend context. Now: Odoo mobile approval with vendor comparison, grade and negotiation history; spend tiers enforced automatically.
- 3
Store Indent → PO Traceability: 10-Second Trace
Before: Indents in email or verbal form, unlinked to the PO. Now: Indent → purchase request → RFQ → negotiation → comparison → PO, all linked; any PO traced to its indent in 10 seconds.
- 4
Grade Classification: Wrong Grade Blocked
Before: Grade checked by eye, after delivery. Now: Grade enforced on request, RFQ, comparison table and PO; Grade A/B price comparison blocked.
Key Features /Highlights
WhatsApp → Vendor RFQ Portal: Negotiations on Record
Before: Requirements and replies scattered across WhatsApp and a spreadsheet. Now: RFQs sent from Odoo; every counter-offer stored with timestamp and actor, linked to the final PO.
WhatsApp to MD → Mobile Approval: Context on Every PO
Before: Approval by WhatsApp message, with no spend context. Now: Odoo mobile approval with vendor comparison, grade and negotiation history; spend tiers enforced automatically.
Store Indent → PO Traceability: 10-Second Trace
Before: Indents in email or verbal form, unlinked to the PO. Now: Indent → purchase request → RFQ → negotiation → comparison → PO, all linked; any PO traced to its indent in 10 seconds.
Grade Classification: Wrong Grade Blocked
Before: Grade checked by eye, after delivery. Now: Grade enforced on request, RFQ, comparison table and PO; Grade A/B price comparison blocked.
Approach& Process
Weeks 1–3: Discovery & Process Mapping
Procurement workflow and vendor interactions mapped; grade rules, approval thresholds and warehouse locations defined.
Weeks 4–7: Custom Module Development
Grade classification engine, store indent and PR workflow, vendor RFQ portal, and comparison table with PO generation built.
Weeks 8–10: Data Migration & Testing
Vendor master and graded product catalogue imported, approval hierarchies configured, UAT with procurement.
Weeks 11–12: Go-Live & Optimisation
Procurement trained on the portal and RFQ flow, MD mobile approval live, and the 15-to-5-day cycle achieved.
Outcome &Results
67% Shorter Procurement Cycle
Zero Grade-Mixing Incidents
Every Negotiation Round Recorded
Spend Tiers Enforced
Any PO Traced to Its Indent
MD Approves With Full Context
What Changed
After Go-Live
“We had a 9-day project delay because someone ordered the wrong grade of panel and there was nothing in writing to prove what was actually agreed. That doesn't happen anymore. Procurement is now something we can audit, not just remember” — Director, Ganesh Green Bharat Limited. (Client quote — subject to client approval.)
What Changed /
After Go-Live
“We had a 9-day project delay because someone ordered the wrong grade of panel and there was nothing in writing to prove what was actually agreed. That doesn't happen anymore. Procurement is now something we can audit, not just remember” — Director, Ganesh Green Bharat Limited. (Client quote — subject to client approval.)
Metrics &Impact Summary
15 → 5 days Procurement Cycle (PR to PO)
67% Cycle Time Reduction
0 Grade-Mixing Incidents
4 Custom Modules Built
12 Wks Full Implementation
10 s PO Traced to Original Indent
FutureRoadmap
1. COMPLETED Procurement Controls Go-Live
2. NEXT [[TODO-OWNER: real next phase]]
3. LATER [[TODO-OWNER: or remove]]